Vendor Load-In Window Calculator
Estimates how many hours before doors your vendor trucks need to start unloading, and how many dock bays it takes to fit the load-in in the time the venue gives you, for planners, venue managers and production leads.
Your estimate
Estimates only. Assumptions are listed below, and you can change every input.
Frequently asked questions
Why does the calculator add the longest setup after all the trucks instead of overlapping it?
Because that is the case that hurts you. If the staging truck is stuck in the last wave, the whole room waits on it. If you can guarantee that vendor unloads first, subtract one wave of dock time from the window you need.
What counts as a dock bay if the venue has no real loading dock?
Any spot where a truck can legally sit and unload at the same time as another: a curb lane, an alley, a lot with a ramp. Count only the spots you have been told you can use, not the ones you hope to use.
Can I use this for load-out and strike as well?
Yes, in reverse. Set the setup input to your longest teardown, the walkthrough buffer to your final sweep, and the hours available to the time between the end of the event and the venue curfew.
https://gigtimelinr.com/tools/vendor-load-in-window/Free for readers and publishers alike. If you cite the result in an article, a link to this page helps others find it.
More free tools from GigTimelinr
- Run of Show Buffer Calculator: Estimates how much schedule slack a day-of run of show has before the hard stop once realistic overruns are added, for event planners and stage managers building minute-by-minute timelines.
- Timeline Update Time Saved Calculator: Estimates how many hours a year a planner spends re-sending revised run-of-show timelines to vendors one by one, and what a single shared live timeline would save in hours and dollars.