Run of Show Buffer Calculator
Estimates how much schedule slack a day-of run of show has before the hard stop once realistic overruns are added, for event planners and stage managers building minute-by-minute timelines.
Your estimate
Estimates only. Assumptions are listed below, and you can change every input.
Frequently asked questions
What overrun percentage should I use if I have no history from past events?
Start with the default, run the numbers, then run them again at a higher value to see how fragile the schedule is. The honest answer is that the right number comes from timing your own events, which is exactly what a shared run of show lets you do afterward.
Should I add buffer blocks to the timeline or just shorten segments?
Both work, but named buffer blocks are easier to protect on the day. If the slack figure is positive, spread it as short buffers after the segments most likely to run long, such as speeches and meal service.
Does this account for the event starting late?
Not directly. If doors or the ceremony usually start late, either reduce the hours in the window input or treat the late start as an extra segment with its own length.
https://gigtimelinr.com/tools/run-of-show-buffer/Free for readers and publishers alike. If you cite the result in an article, a link to this page helps others find it.
More free tools from GigTimelinr
- Vendor Load-In Window Calculator: Estimates how many hours before doors your vendor trucks need to start unloading, and how many dock bays it takes to fit the load-in in the time the venue gives you, for planners, venue managers and production leads.
- Timeline Update Time Saved Calculator: Estimates how many hours a year a planner spends re-sending revised run-of-show timelines to vendors one by one, and what a single shared live timeline would save in hours and dollars.